Request

Contact

Company:

Responsible:

Phone:

* E-Mail:

Fax:

Street:

ZIP:

City:

Plant

Plant:

Project, e.g. Project-no.:

Name of machine (operator) + TAC:

Type of the machine (manufacturer):

Identical build and equipped machines

Please fill out one data sheet per machine.
In case of identical build and equipped machines please name the quantity.:

Data of compressor / pump (to be monitored)

Medium (e. g. H2, natural gas...):

Machine power in hp / kW:

Construction (horizontally, vertically,...):

Machine speed in rpm:

No. of cylinders (total):

No. double acting cylinders:

No. single acting cylinders:

No. of stages:

Max. temperature of media ( °C or °F ):

Max. discharge pressure each stage (psi):

Data, Drive (for engines to be monitored)

Type of drive, media (E-, diesel, natural gas, .....):

Drive power in hp / kW:

Construction (Boxer, V, Integral,..):

Drive speed in rpm:

No. of cylinder:

2 stroke / 4 stroke:

Max. ignition pressure (PSI):

Max. combustion temp. (°C or °F):

DCS-Connection

Digital DCS connection y/n:

If yes; which type of system:

No. of DCS values (appr.):

Analogous DCS conection y/n:

If yes; which type of signal (4-20 mA, 0-10 V....):

No. of analogous DCS values (appr.)::

Existing Sensors, Probes

No. of installed acceleration probes (vibration):

If installed: type of probe and signal:

No. of installed pressure transmitter ( for p-V diagram ):

If installed: type of transm. and signal:

No. of installed (drilled) indication bores:

If installed: Type of indicator valve:

No. of installed rod-drop proximitor probes:

If installed: type of probe and signal:

No. of installed trigger proximitor probes:

If installed: type of probe and signal:

Please pay attention! All existing signals wired to the PROGNOST-NT-System have to be ex- and galvanic separated. There is no intermediate processing permitted!

PROGNOST-NT Options - please mark if wanted

Safety Protection (High speed monitoring of thresholds; vibration)

Early Failure Detection (crank angle related vibration analysis)

Efficiency Optimization (p-V diagram analysis)

Wear Monitoring (rod-drop, temperatures, ...)

Process Data Integration and Analysis (multistage monitoring)

SLubrication Monitoring

Maintenance and Component Tracking / Asset Control

Planned quantity of workstations for the PROGNOST-NT Visualization

Which goals should PROGNOST match?

Captcha


Please type in the numeric code to the form field "numeric code" .